A U R E A

Loading

Hello There!

Contact Us

Get A Quote
Key Features

Why Choose This System?

Engineered for reliability, safety, and maximum return on investment across all C&I and utility-scale energy storage applications.

Hybrid Integration Hybrid Integration
01

Intelligent Hybrid Technology for Optimal Energy Use

Our system automatically switches between solar power, grid, and battery storage based on real-time energy demand and availability. The built-in EMS continuously analyses power flow to maximise renewable utilisation, reduce peak demand charges, and minimise grid dependency — cutting electricity costs by up to 60% for commercial and industrial users.

Scalable Design Scalable & Modular
02

Scalable & Future-Ready Industrial Design

The modular cluster architecture allows easy capacity expansion — add more battery strings or parallel additional containers as your energy needs grow. Deployable as a standalone 2MW/4MWH unit or stacked into multi-MW arrays for utility-scale projects. Built with industrial-grade components rated for harsh environments including mining, islands, and deserts, backed by 10+ years of proven reliability.

LFP Battery 4MWH LFP Storage
03

High-Capacity 4MWH LFP Battery Storage

Equipped with Grade-A LFP (Lithium Iron Phosphate) cells delivering 4,085 kWh of usable energy, the system provides long-lasting backup power and ensures continuous operation during blackouts or grid outages. LFP chemistry offers superior thermal stability, non-combustibility, and over 6,000 deep-cycle charge-discharge cycles — extending the calendar life of the entire system beyond 20 years with minimal capacity fade.

Smart EMS Smart EMS
04

Smart Energy Management & Remote Monitoring

Compatible with Aurea's cloud-based Energy Management System, the unit supports remote monitoring via web dashboard and mobile app (iOS & Android), giving operators full visibility over energy consumption, battery state of health, and dispatch performance. Automated strategies include peak shaving, frequency regulation, demand response, and VPP aggregation — all configurable remotely without site visits.

Mechanical Parameters

System Configuration & Specifications

Complete technical data for the AUREA-BESS-2MW4MWH-40HQ. Compare with other models in the series or request a custom configuration.

AUREA C&I ESS Series Configuration

Parameter 500KW / 1MWH 1MW / 2MWH 2MW / 4MWH ★ 3MW / 6MWH
Model AUREA-500K-1M AUREA-1MW-2M AUREA-2MW-4M AUREA-3MW-6M
Rated Energy 1,075 kWh 2,150 kWh 4,085 kWh 6,130 kWh
Rated Power 500 kW 1,000 kW 2,000 kW 3,000 kW
LiFePO4 Battery (Grade A) 314Ah × 240S × 4P 314Ah × 240S × 8P 314Ah × 240S × 16P 314Ah × 240S × 24P
Container 20ft Standard 20ft High-Cube 40ft High-Cube 40ft HC × 2
PCS Modules 500 kW × 1 500 kW × 2 1,000 kW × 2 1,000 kW × 3
Cooling Method Air Cooling Liquid Cooling Liquid Cooling Liquid Cooling
AC Voltage (configurable) 400 / 480V 400 / 480 / 690V 400 / 480 / 690V 400 / 480 / 690V
RT Efficiency ≥ 87% ≥ 88% ≥ 88% ≥ 88%
IP Rating IP55 IP55 IP55 IP55
Fire Suppression FM200 / Aerosol FM200 / Aerosol FM200 / Aerosol FM200 / Aerosol
Cycle Life ≥ 6,000 cycles ≥ 6,000 cycles ≥ 6,000 cycles ≥ 6,000 cycles
Design Life 20 Years 20 Years 20 Years 20 Years
★ Currently viewing: 2MW / 4MWH model  |  AUREA ENERGY — Better & Brighter Future  |  We use ONLY Grade-A Approved Cells

Detailed Technical Specifications — 2MW / 4MWH

ParameterSpecification
Battery System
Battery ChemistryLFP — Lithium Iron Phosphate
Cell Specification3.2V / 314Ah Grade A Prismatic
Nominal System Voltage768 V DC
DC Voltage Range614 V ~ 870 V DC
Cycle Life @ 80% DoD≥ 6,000 Cycles (25°C)
State of Health (EoL)≥ 80% Capacity Retention
Power Conversion System (PCS)
Rated AC Power2,000 kW (2 × 1,000 kW)
AC Output Voltage400V / 480V / 690V (configurable)
AC Frequency50 Hz / 60 Hz
Peak Efficiency≥ 98.5%
Power Factor≥ 0.99 (leading / lagging)
THD Voltage≤ 3%
Thermal Management
Cooling MethodIndirect Liquid Cooling + Air Conditioning
Cell Temperature Range (maintained)20°C ~ 35°C
Ambient Operating Temperature−20°C ~ +55°C
Operating Humidity5% ~ 95% RH (non-condensing)
Safety & Physical
Container Standard40ft High-Cube ISO 668
Outer Dimensions (L×W×H)12,192 × 2,438 × 2,896 mm
Total WeightApprox. 38,000 kg
IP RatingIP55
Fire SuppressionAutomatic FM200 / Aerosol (NFPA 855)
CertificationsCE / IEC 62619 / UL 9540 / UN38.3 / ISO 9001
Commissioning Time≤ 3 Working Days On-Site
Products Details

Core Subsystem Overview

Each subsystem inside the 2MW/4MWH ESS is factory-assembled, individually tested, and pre-commissioned before delivery — ensuring rapid site deployment and long-term reliability.

LFP Battery Pack
LFP Battery Pack & BMS
Power Conversion System
Bidirectional PCS Unit

LFP Battery Pack

  • 314Ah Grade-A LFP prismatic cells — tier-1 manufacturer
  • Compact cluster design with independent fault isolation per string
  • Automated cell balancing at cell and pack level
  • ≥ 80% capacity retention at end of 6,000th cycle
  • Self-discharge ≤ 3% per month — suitable for seasonal storage

Bidirectional Power Conversion System

  • 2 × 1,000 kW modular PCS — optional N+1 redundancy
  • Peak conversion efficiency ≥ 98.5%
  • AC output: 400V / 480V / 690V (configurable per site)
  • Power factor ≥ 0.99, harmonic distortion THD ≤ 3%
  • Black-start capability for critical load restoration
Liquid Cooling
Liquid Cooling System
EMS Cloud
Cloud EMS & SCADA

Precision Liquid Cooling System

  • Indirect liquid cooling — no electrolyte contact risk
  • Cell temperature uniformity within ±2°C across all clusters
  • Operates across ambient range −20°C to +55°C
  • Anti-freeze protection to −40°C (optional heating pads)
  • Variable-speed coolant pump — energy-optimised operation

Cloud EMS & Intelligent Dispatch

  • Real-time SCADA dashboard — web and mobile app
  • Automated strategies: peak shaving, arbitrage, frequency regulation
  • VPP-ready with OpenADR 2.0 and AGC/AVC dispatch support
  • Protocols: Modbus TCP/RTU, IEC 61850, DNP3, MQTT, CAN
  • AI-powered SOH prediction and predictive maintenance alerts
System Commissioning

System Commissioning & Debugging

Every AUREA ESS undergoes rigorous factory acceptance testing (FAT) before shipment, and a structured on-site commissioning procedure ensures full system readiness within 3 working days of delivery.

1
Power-On & Initialization Test System boot-up verification, LED indicators, HMI display responsiveness, and communication link checks between BMS, PCS, and EMS.
2
PCS Functionality & Grid Synchronisation Verification of grid-tie and off-grid modes, voltage/frequency output stability, reactive power compensation, and anti-islanding protection.
3
Battery Integration & BMS Validation Full charge-discharge cycle test, BMS communication validation, SOC calibration, thermal management confirmation, and fire-detection system check.
4
EMS Strategy & Remote Access Handover Dispatch strategy configuration, cloud dashboard setup, mobile app activation, and operator training handover with commissioning report delivery.
Aurea Technical Support

Why Choose Aurea Energy?

  • Industry-Leading Efficiency — PCS conversion efficiency ≥ 98.5% with advanced MPPT solar integration, delivering the lowest levelised cost of storage (LCOS) in its class.
  • Reliable 24/7 Power — Seamless <20 ms transition between grid-tied, off-grid, and backup modes ensures zero-interruption power supply for critical industrial loads.
  • Low Maintenance & Durable — Grade-A LFP cells with a 20-year design life and ≥ 6,000 cycle rating minimise replacement costs and maximise the project's IRR.
  • Smart Energy Management — Real-time cloud monitoring, AI-powered adaptive performance optimisation, and open API integration reduce operational overhead and maximise revenue streams.
  • 10-Year Performance Warranty — Guaranteed ≥ 80% battery capacity retention and ≥ 97% system availability over the warranty period, with prorated replacement coverage.
  • Global Service Network — Dedicated field engineers and regional spare parts depots ensure next-business-day support response for installations worldwide.
Contact Technical Team
Aurea ESS Project
Need Technical Assistance?

Our engineering team is available Mon – Fri 8:00am – 6:00pm CST. Emergency support 24/7.

img

Power the world
with Made in China

Learn More